How Civil Site Plans Influence Wastewater Lift Station Design

If you draw a circle around the lift station on a civil map it’s easy to envision it as a part of self-contained equipment.

In reality, water comes from somewhere, passes through the station and goes on to another location. It also relies on the structural elements such as power, control, and site access.

One thing that is useful to project teams trying for the most effective lift station designer is whether they consider the interfaces and not only what happens inside the station.

Image credit: romtecutilities.com

Then, start upstream of Wet Well

Consider a residential development. Wastewater flows through the collection system toward the lift station. The incoming flow conditions and site elevations help establish the type of water that the station will be required to handle.

Once wastewater reaches the wet well, a second set of engineering choices are made. Valves, pumps, pipes control, structural parts, and potentially other equipment must be adapted to the application.

Romtec Utilities is a wastewater design company that creates systems to meet the particular needs of every site which may be industrial, commercial, or municipal.

The method of the project is essential because what happens upstream could alter the objectives of the pumping station.

Follow the Water Beyond the Pumps

The issue doesn’t end when the liquid has escaped the well. The pumping system must be able to push the liquid to meet the hydraulic conditions of downstream systems. Station design and the selection of pumps will be influenced by necessary flow rate and head pressure.

That connection is particularly important when evaluating the best wastewater designers. The specifications of a pump are impressive, but their performance must be rational within the overall hydraulic system.

Romtec Utilities is able to design all the elements of the pumping plant, such as the structure and the mechanical, electrical, and the communications in a complete package. This helps coordinate the equipment needed for the project.

Stormwater is a network of its own

Stormwater is a unique infrastructure puzzle. Runoff from developed surfaces may get into an infrastructure to collect and then pass through detention, drainage, or flood control. Pumping stations are part of a wider stormwater management strategy.

It is important for organizations searching for the most efficient stormwater engineers to take into account the site conditions, the rates of flow, head requirements, environmental aspects as well as the plans for stormwater management.

Romtec Utilities provides customized stormwater pumping systems for residential as well as commercial projects.

Coordination Extends Above Ground Too

Some interfaces do not require pipes. The electrical service should be in place to support the equipment. Control and communication systems must be designed to meet the requirements of the project. Contractors should have the correct plans and documentation. Installation, startup and service might require physical access.

This is a difficult project that involves multiple parties and disciplines, so a clear system document is crucial. Romtec Utilities offers complete plans and project documents. It also supports the systems right from start-up to commissioning and testing.

Explore Beyond the Station Boundary

Even even if a lift station has been constructed correctly, it could remain a component of a project that is not coordinated if the external connections aren’t correctly addressed.

The water is an excellent design reference. Where did it come from? In what conditions does it get to the station? What is it expected to do there? What happens when it’s out? What infrastructure will support the entire process?

The answers to these questions change the concept of lift stations from a basic equipment exercise into a complex infrastructure project.

Scroll to Top